| 000 | 00821nam a2200241 a 4500 | ||
|---|---|---|---|
| 001 | vtls000314975 | ||
| 003 | UG-KaMUL | ||
| 005 | 20250614163051.0 | ||
| 039 |
_a201305020903 _d952 _c201305020859 _d952 _y 201304241145 _z952 |
||
| 040 | _aUG-KaMUL | ||
| 082 |
_a624 _222 |
||
| 092 | _aU 624 ENG | ||
| 100 | _aEngeu, Apolot Ruth. | ||
| 245 |
_a Investigation of the cause of delay and cost overrun in construction projects in Uganda's public sector / _cApolot Ruth Engeu. |
||
| 260 |
_aKampala, _c2011 |
||
| 300 |
_axiv, 112 p. ; _c30 cm. |
||
| 502 | _aUnpublished thesis ( MSc.Eng. Civ.) - Makerere University, 2011 | ||
| 504 | _aIncludes bibliographical references (p. 84-87 ). | ||
| 650 |
_aConstruction contracts _zUganda |
||
| 852 | _dML | ||
| 942 |
_2ddc _cBK |
||
| 999 |
_c613291 _d613291 |
||