000 00815nam a22002411a 4500
001 vtls000323629
003 UG-KaMUL
005 20250614155200.0
039 _y 201408291508
_z961
040 _aUG-kaMUL
082 _a657,869
092 _a657,869 ENG
100 _aEngeu , Apolot Ruth
245 _aInvestigation of causes of delay and costs overturns in construction projects in Uganda's public sector /
_cby Apolot Ruth Engeu
260 _aKampala:
_bMakerere University ,
_c2011
300 _axiv, 112 p. :
_bill. ;
_c30 cm.
502 _aThesis ( M. Sc. Civil Engineering )--Makerere University,2011
504 _aIncludes bibliographical references ( p. 84-87 )
650 _aConstruction industry
_xCosts
_zUganda
852 _dTECH
942 _2ddc
_cBK
999 _c585302
_d585302