| 000 | 00825cam a2200277 a 4500 | ||
|---|---|---|---|
| 001 | vtls000310197 | ||
| 003 | UG-KaMUL | ||
| 005 | 20250613003513.0 | ||
| 010 | _a94-227450 | ||
| 020 | _a0962818259 | ||
| 039 |
_a201503261305 _b 902 _c 201208241543 _d 902 _y 201208241538 _z902 |
||
| 040 |
_aDLC _c DLC _d DLC _d UG-KaMUL |
||
| 082 |
_a658.5 _2 20 |
||
| 092 | _a658.5 COS | ||
| 100 | _aCostanza, John R. | ||
| 245 |
_a The quantum leap-- in speed-to-market / _cby John R. Costanza. |
||
| 250 | _a3rd ed. | ||
| 260 |
_aDenver, Colo. : _bJc-I-T Institute of Technology, _c 1996 |
||
| 300 |
_ax, 352 p. : _bill. ; _c 24 cm. |
||
| 500 | _aIncludes index. | ||
| 650 | _aProduction management. | ||
| 650 | _aProduction control. | ||
| 650 | _aJust-in-time systems. | ||
| 942 |
_2ddc _cBK |
||
| 999 |
_c552526 _d552526 |
||