| 000 | 00954cam a22002777a 4500 | ||
|---|---|---|---|
| 001 | vtls000260976 | ||
| 003 | UG-KaMUL | ||
| 005 | 20250612203350.0 | ||
| 020 | _a9780750680165 (pbk.) | ||
| 020 | _a0750680164 (pbk.) | ||
| 039 |
_a201310251750 _b993 _c201303121241 _d 901 _c201208281237 _d 964 _c200909091542 _d 901 _y200909020827 _z 938 |
||
| 040 |
_aUKM _d BAKER _d BWKUK _d YDXCP _d UMC _d DLC _d UG-KaMUL |
||
| 082 |
_a690.068/1 _2 22 |
||
| 092 | _a690.068 SMI | ||
| 100 |
_aSmith, Jim, _d 1946- |
||
| 245 |
_aBuilding cost planning for the design team / _cJim Smith and David Jaggar. |
||
| 250 | _a2nd ed. | ||
| 260 |
_aAmsterdam : _bButterworth-Heinemann, _c2007. |
||
| 300 |
_axii, 401 p. : _bill. ; _c24 cm. |
||
| 504 | _aIncludes bibliographical references and index. | ||
| 650 |
_aConstruction industry _x Cost control. |
||
| 650 |
_aBuilding _x Estimates. |
||
| 700 | _aJaggar, David. | ||
| 942 |
_2ddc _cBK |
||
| 999 |
_c469191 _d469191 |
||