| 000 | 00854nam a2200229 a 4500 | ||
|---|---|---|---|
| 001 | vtls000333072 | ||
| 003 | UG-KaMUL | ||
| 005 | 20250618011727.0 | ||
| 039 | 9 |
_a 201709131238 _b 993 _y 201706131948 _z 916 |
|
| 040 | _aUG-KaMUL | ||
| 082 | 0 |
_a333.914 _2 23 |
|
| 092 | _aU 333.914 ATWO | ||
| 100 | 1 | _aAtworekire, Silas. | |
| 245 | 1 | 0 |
_aPublic participation in environmental and social impact assessment for hydroelectric power projects : _ba case study of Bui Dam in Ghana / _cSilas Atworekire. |
| 260 |
_aKampala, _c2016. _b |
||
| 300 |
_a xii, 64 p. : _b ill., some col. ; _c 30 cm. |
||
| 504 | _a Includes bibliographical references (p. 50-54) | ||
| 520 | _a Unpublished dissertation (Msc. ENVT&NR) - Makerere University, 2016 | ||
| 650 | 0 |
_aWater-power _zGhana. _v _x _y |
|
| 942 |
_2ddc _cBK |
||
| 999 |
_c222781 _d222781 |
||