| 000 | 00929nam a2200241 a 4500 | ||
|---|---|---|---|
| 001 | vtls000168876 | ||
| 003 | UG-KaMUL | ||
| 005 | 20250617230340.0 | ||
| 039 | 9 |
_a 201307051136 _b 918 _c 200906051232 _d 952 _c 200605031655 _d 902 _y 200604131722 _z 953 |
|
| 040 | _aUG-KaMUL | ||
| 082 | _a338.09 | ||
| 092 | _aU 338.09 MPI | ||
| 100 | 1 | _aMpimbaza, Georgian. | |
| 245 | 1 | 4 |
_aThe challenges involved in the process of planning for industrial de velopment : _ba case study of Nakawa 1 and Bugolobi Parishes in Nakawa Division / _cGeorgian Mpimbaza. |
| 260 |
_aKampala, _c2005. _b |
||
| 300 |
_a viii, 53p. : _b tabs, maps ; _c 30cm. |
||
| 502 | _a Dissertation (B.A., Urb.Plan.) - Makerere University , 2005. | ||
| 504 | _a Includes bibliographical references (p.42-43). | ||
| 650 | 0 |
_aIndustrial location. _x _v _y _z |
|
| 942 |
_2ddc _cBK |
||
| 999 |
_c182622 _d182622 |
||