TY - BOOK AU - Litty,Jose TI - Development of a constraint directed scheduling system : : a case s tudy of Abrahams International Limited / U1 - U 658.53 LIT PY - 2005/// CY - Kampala, KW - Production scheduling KW - Scheduling KW - Production control KW - Time management N1 - Thesis (M.Sc., Mch. Engn.) - Makerere University, 2005; Includes bibliographical references (p.164-170) ER -